Google Sheets

Grant Tracker in Google Sheets: Step by Step Tutorial

This tutorial builds a grant tracking spreadsheet in Google Sheets for a fictional youth nonprofit in Pittsburgh with 20 grants. The finished sheet shows money awarded and spent, every report that is due, and an alert for each grant.

Grant tracker in Google Sheets tutorial
Grant tracker in Google Sheets tutorial

Watch the video tutorial

The video shows the finished tracker first and then builds each formula on the start tab, with one live test at the end.

What you will build

Finished grant tracker with KPI cards and alerts
Finished grant tracker with KPI cards and alerts

At the review date of 11/30/2026 there are 16 active grants worth $1,440,000, with $874,600 spent (61%), $565,400 left, one report overdue and six due within 30 days.

The starting data

Each row has the grant ID, funder, program, manager, status, start and end date, award, amount spent and next report due date. The review date sits in D4.

Start tab with grant data typed in
Start tab with grant data typed in

Step 1: Status dropdown

Select F11:F30, open Data, then Data validation, and keep Active, Pending and Closed as the only choices. Reject any other input.

Data validation dropdown for grant status
Data validation dropdown for grant status

Step 2: Spent percent and spend bar

=J11/I11

Spent percent column
Spent percent column

=SPARKLINE(L11,{"charttype","bar";"max",1;"color1","#2E75B6"})

SPARKLINE bar for spent percent
SPARKLINE bar for spent percent

Step 3 and 4: Remaining money and day counts

=I11-J11

=IF(F11="Active",H11-$D$4,"")

=IF(F11="Active",K11-$D$4,"")

Press F4 so the review date stays locked when you fill the formulas down.

Days left formula with a locked review date
Days left formula with a locked review date

Step 5: The alert column

=IF(F11<>"Active","",IFS(P11<0,"REPORT OVERDUE",P11<=14,"REPORT DUE SOON",AND(L11>=90%,O11>60),"SPENDING FAST",TRUE,"ON TRACK"))

IFS stops at the first true test, so overdue comes before due soon. The result is 1 overdue, 3 due soon, 2 spending fast and 10 on track.

IFS alert formula
IFS alert formula
Conditional formatting colours for the alerts
Conditional formatting colours for the alerts

Step 6: KPI cards

=SUMIF(F11:F30,"Active",I11:I30)

=SUMIF(F11:F30,"Active",J11:J30)

=COUNTIFS(F11:F30,"Active",P11:P30,"<=30")

KPI cards for awarded, spent, remaining and reports due
KPI cards for awarded, spent, remaining and reports due

Step 7: Status box

=IF(COUNTIF(Q11:Q30,"REPORT OVERDUE")=0,"ALL REPORTS ON TIME",COUNTIF(Q11:Q30,"REPORT OVERDUE")&" REPORT OVERDUE")

Two custom conditional formatting rules turn the box green or red.

Status box above the table
Status box above the table

Step 8: Reports due in the next 30 days

=SORT(FILTER({B11:B30,C11:C30,E11:E30,K11:K30,P11:P30},F11:F30="Active",P11:P30<=30),5,TRUE)

Reports due list built with SORT and FILTER
Reports due list built with SORT and FILTER

Step 9: Funding by program

=QUERY({D11:D30,F11:F30,I11:I30,J11:J30},"select Col1, sum(Col3), sum(Col4) where Col2 = 'Active' group by Col1 order by sum(Col3) desc label Col1 'Program', sum(Col3) 'Awarded', sum(Col4) 'Spent'",0)

Select the summary, insert a column chart, and compare awarded with spent for each program.

Funding by program summary and chart
Funding by program summary and chart

Test the tracker

Change the next report due date of grant G-2607 to 02/26/2027. The alert changes to on track, the status box turns green and the 30-day count drops from six to five.

Tracker after the overdue report is sent
Tracker after the overdue report is sent

Formulas used

Need Function
Spend bar SPARKLINE
Alert labels IF, IFS, AND
Totals and counts SUMIF, COUNTIF, COUNTIFS
Due list SORT, FILTER
Program summary QUERY

Want it ready to use?

The Nonprofit Grant Dashboard in Google Sheets includes 4 KPI cards, 13 charts on 6 tabs, slicers and a grant ID lookup.

To go further, join the Google Sheets Complete Course on Next Gen Templates Academy. Code BF40 gives 40% off until 1 December 2026, 23:59 IST.

Frequently asked questions

What is a grant tracking spreadsheet?

It is one sheet that lists every grant with its funder, dates, award, spend and next report date, and warns you when something needs action.

How do I flag an overdue funder report in Google Sheets?

Subtract a review date from the report due date. A result below zero means the report is overdue, and an IFS formula can label it.

Why does the tracker use a review date instead of TODAY?

A fixed review date keeps month-end numbers stable. In your own file you can put =TODAY() in that cell.

Why do all my SPARKLINE bars look full?

Without the max option every bar is scaled to its own value. Set max to 1 so a full bar means 100% spent.

Why does QUERY need Col1 and Col2 here?

When the data is an array in curly brackets, the columns have no letters, so QUERY refers to them as Col1, Col2 and so on.

Is the build-along file free?

No. This is a build-along tutorial. The ready-to-use Nonprofit Grant Dashboard is a paid template on Next Gen Templates.

Conclusion

A status dropdown, a locked review date and one IFS formula turn a list of grants into a warning system. Add your own grants and set the review date to TODAY when you want it live.

PK
Written by PK (Priyendra Kumar)
Microsoft Certified Professional with 15+ years in data analysis, dashboards and automation. Creator of PK: An Excel Expert and NeoTech Navigators on YouTube. About the author
Tested in the real tool · Last reviewed November 28, 2026
PK
Meet PK, the founder of NeotechNavigators.com! With over 15 years of experience in Data Visualization, Excel Automation, and dashboard creation. PK is a Microsoft Certified Professional who has a passion for all things in Excel. PK loves to explore new and innovative ways to use Excel and is always eager to share his knowledge with others. With an eye for detail and a commitment to excellence, PK has become a go-to expert in the world of Excel. Whether you're looking to create stunning visualizations or streamline your workflow with automation, PK has the skills and expertise to help you succeed. Join the many satisfied clients who have benefited from PK's services and see how he can take your data analysis skills to the next level!
https://neotechnavigators.com